Friday, January 30, 2009

Day Two - Part 2


It took a lot of work, but I finally have everything off the roof. Here is all of the vents, antenna, and assorted vents all laid out on the ground. Along with a box I put together to lower everything down.


The next step was to remove the side rail from one side. This was the last major task for day 2.


Here is one corner of roofing peeled away. The existing roofing is very thin. It looks like it's going to be a very tough day tomorrow.



Here is the first sign of a extensive work to be done on the roof even after the rubber is up.

Posted by Picasa

No comments:

Post a Comment