The start of day two was the air conditioner. I took the cover off on the roof only to see nothing in the way of bolts to remove. I then came inside and found 4 7" bolts in the four corners of this metal flange.
Here you can see I'm using my cordless drill with a flexible socket driver. This was an answered prayer for removing the screws on the roof, and taking out these 7" bolts in no time flat.
Here is a view of the roof with everything off. My plan based on some others who have done a similar project is to leave the air conditioner on the roof and simply move it around as needed.
Here is a view the other direction. The two vent pipes are loose, I'm leaving them in until I'm ready to roll out the new roof. This should help keep debris from falling into the tanks.
No comments:
Post a Comment