Thursday, February 12, 2009

Day 6


It never rains in California, except when I have a major project or my parents come into town. This day we focused on the section of roof laminate has come loose and popped up. We decided to cut our a section of the plywood and take out whatever Styrofoam needs to be removed.


This picture shows an up close picture of the ceiling around the vent pipe. I'm not sure you can see, but apparently when they installed the cabinet in the bathroom they pushed up on the ceiling putting stain on the luan roof. It finally popped and left a sharp edge pointing up into rubber membrane.


The side rails on the edge of the roof took the hardest hit from water damage. The front passenger and rear driver sections took the hardest hit. We replaced about 8' in each side.





Posted by Picasa